When Is a Silt Fence Required?

A silt fence is required when your development consent or site erosion and sediment control plan specifies one. In practice, it is commonly used below disturbed soil where rain could carry sediment towards drains, waterways or neighbouring land. Install the specified controls before earthworks begin, not after the first muddy runoff appears.

For Australian projects, check your approval conditions and council requirements first. The NSW erosion and sediment control guidelines explain that their use becomes mandatory where required by development consent; the guidance itself is not a blanket requirement to fence every site.

Understanding Silt Fences

What is a silt fence used for?

A silt fence is a temporary barrier used to retain sediment from disturbed ground before runoff leaves a work area. The US EPA silt fence factsheet explains that it slows and ponds muddy water so soil particles can settle; it does more than strain water through fabric.

This helps protect stormwater drains and downstream waterways. Compare the dimensions of the 0.77m x 100m standard green silt fence roll with the fabric specified in your site plan before ordering.

Choose purpose-made sediment control fabric to the specified grade. Ordinary shadecloth is not an interchangeable substitute; permeability, strength and the installed height all affect performance.

Most silt fences are designed as temporary measures during construction or earthworks. Keep them in place until the contributing ground is stabilised and the removal conditions in your site plan are met.

Regulatory Requirements for Silt Fences

The requirement for silt fencing is typically dictated by local environmental regulations, which aim to protect water quality and prevent erosion and sedimentation. In Australia, councils and state environmental agencies set specific guidelines based on site characteristics and proximity to sensitive areas.

These activities can create a need for sediment controls; the approval and site plan determine whether a silt fence is the appropriate measure:

  • Construction Sites: Any construction activity that disturbs soil, such as building, renovating, or clearing land, often requires silt fencing to prevent sediment from leaving the site, especially if it is near water bodies or storm drain inlets
  • Landscaping Projects: Large-scale landscaping projects that significantly alter the natural terrain, or where vegetation is removed, might also require silt fencing to control sediment runoff
  • Agricultural Operations: In areas prone to erosion, especially on sloped lands where ploughing or crop removal takes place, silt fencing may be necessary to prevent soil loss
  • Mining and Quarrying Activities: These operations usually involve substantial earth movement and often need comprehensive sediment control measures, including silt fencing, to comply with environmental standards
  • Roadworks and Civil Infrastructure: Projects involving road construction, pipeline installation, or utility trenching typically require sediment barriers along the work zone perimeter

Where visibility matters, the orange hi-vis 0.77m silt fence roll makes the barrier easier to identify around an active work area. Colour alone does not establish compliance with the sediment control specification.

An orange silt fence surrounds a construction work area in an Australian suburban setting.

A small site is not automatically exempt from sediment controls. While some councils reference a 250 square metre disturbance threshold for mandatory erosion and sediment control plans, this trigger varies between local government areas and does not override conditions on a specific development consent. For example, Blacktown City Council's soil erosion and sediment controls require an ESCP for development involving soil disturbance, cut or fill, or material storage, submitted before the construction certificate is issued.

Before clearing or excavation, locate the sediment controls on your approved plan and confirm who will install, inspect and maintain them. A dry forecast does not replace those requirements.

When does sediment fencing need to go in?

Install sediment fencing before the soil disturbance it is intended to contain. A residential sediment control plan lodged on the NSW Planning Portal, for example, sequences the fence before demolition and excavation. Use your own approved plan to set the sequence on your job.

Factors Influencing the Need for Silt Fencing

Walk the site before selecting fence locations. The amount and direction of runoff matter as much as the position of the boundary.

  • Proximity to Water Bodies: Sites close to rivers, lakes, wetlands or coastal areas need controls selected for the receiving environment; proximity alone does not establish that a silt fence is sufficient
  • Soil Type: Soil erodibility and particle size affect control selection. Fine clay can remain suspended, so a fence may not adequately treat clay-rich runoff
  • Topography: Sites with steep gradients have higher runoff velocities, which can carry significant amounts of sediment and require more robust barrier systems
  • Weather Patterns: Regions with heavy rainfall may require more robust sediment control strategies, including the use of silt fences during wet seasons
  • Size of Disturbed Area: Larger areas of exposed soil can increase the sediment load and runoff reaching each fence, including on relatively flat sites
  • Duration of Works: Projects spanning multiple months or years typically require more erosion control measures for exposed ground than quick turnaround jobs

Where the site design calls for a biodegradable sediment barrier, the 150mm x 3m coir log is an option to discuss with the designer. Its suitability depends on placement, anchoring and flow conditions; it is not an automatic replacement for a specified silt fence. For Sydney projects using coir as part of the sediment plan, see our guide to coir logs for Sydney erosion control projects.

If your specification calls for a wider fabric roll, compare the premium 0.86m green silt fence roll with the required grade and support system. The installed height and support system must still match the site design.

Installation and Maintenance Best Practices

Correct placement and a sealed fabric base determine whether your silt fence retains sediment. A poorly installed fence can fail during the first heavy rain, sending sediment directly into drains or waterways.

Sediment fence installation before earthworks

Fences should be installed along the contours of the land, with the fabric buried at the base to prevent undercutting. The fabric must be placed on the upslope side of the supporting stakes, never on the downslope side where sediment pressure can push it away from the posts.

Select posts by their specified cross-section, strength and embedment, not length alone. Compare the dimensions of the 17 x 17 x 1800mm hardwood stakes carefully against that specification. Their length alone does not establish adequate structural support.

Use the site plan to resolve these installation decisions before the fence goes in:

Site conditionDecision before installation
Shallow sheet flow below disturbed soilPlace the fence along contours with room for sediment to collect on the upslope side.
Long or steep contributing slopeHave the designer assess contributing runoff and whether staged controls are needed.
Soft groundConfirm post strength and embedment rather than simply buying longer stakes.
Concentrated flow in a drain or channelUse a designed alternative; closer stakes do not make an ordinary silt fence suitable.

Regular inspections become critical to maintaining fence effectiveness. After each significant rainfall, you should check for undercutting, tears in the fabric, loose stakes, and sediment build-up.

Damaged silt fence with torn fabric, loose timber stakes, undercutting and sediment buildup at an Australian site.

Remove sediment before it compromises the fence, using the trigger in your site plan. Kawartha Conservation's silt fencing factsheet recommends removal by one-third of fence height, along with regular inspections and checks after significant rain. Use the inspection frequency required for your Australian site.

Common Installation Mistakes to Avoid

Check the completed fence for these faults before earthworks begin:

  • Installing stakes too far apart, allowing the fabric to sag and reducing sediment capture efficiency
  • Placing the fabric on the wrong side of the stakes where sediment pressure pushes it away from support
  • Failing to bury the bottom of the fabric, creating a gap where sediment flows underneath
  • Joining fence sections incorrectly, leaving gaps or weak points where sediment escapes
  • Installing fences in concentrated flow paths where water velocity will quickly overwhelm the barrier
  • Neglecting to remove accumulated sediment, which reduces capacity and can cause fence failure
  • Using inadequate stakes for soil conditions, leading to movement or collapse during rain events

Another mistake is treating silt fences as a permanent solution rather than a temporary measure. They work best when combined with other erosion controls like vegetation establishment, mulching, and proper site drainage.

Silt fences intercept shallow sheet flow and allow sediment to settle. If you notice water concentrating into channels, you need additional controls like check dams or sediment basins.

When Silt Fences Are Not Enough

Review the controls if runoff bypasses or overwhelms a fence. Replacing damaged fabric alone will not fix a layout that collects too much water.

Concentrated runoff needs controls selected for its flow and sediment load, which may include sediment traps or basins. Silt fences cannot cope with channelised runoff without failing or overtopping.

Very large disturbance areas often require several complementary erosion control products, including stabilised construction entrances, sediment basins, and perimeter fencing. The silt fence becomes one component in a broader system.

Projects near ecologically sensitive areas may need additional protection such as exclusion zones, vegetative buffer strips, or double-fencing arrangements. A single silt fence provides good protection but not absolute containment.

Stabilise completed areas as soon as the work sequence allows, rather than waiting for the whole project to finish. Relying solely on perimeter fencing leaves exposed ground generating sediment throughout the job.

Planning Your Sediment Control Strategy

Start by identifying all potential sediment discharge points, particularly where stormwater leaves your site. These become priority areas for barrier installation and monitoring.

Consider the staging of your works to minimise the area of exposed soil at any one time. Progressively stabilising completed areas reduces the overall sediment load your fences must handle.

Budget for regular maintenance and sediment removal throughout the project duration. Assign someone to inspect the fence and arrange repairs, including when work pauses.

Keep photos and inspection records to track fence condition, repairs and sediment removal. These records also support compliance reviews.

Ground cover reduces the sediment load reaching the fence. Planning how to use coconut fibre for landscaping and erosion control can help you choose complementary surface protection where the site design calls for it.

For help matching roll dimensions and quantities to your specification, contact the All Stake Supply team. Bring your site plan and required fabric grade so the product discussion starts with the requirements of the job.

Once the controls are specified, check the full product range for your site materials to organise the order alongside the fencing.

Silt fence questions before work starts

Is a silt barrier fence the same as a sediment fence?

Yes. These names generally describe the same temporary geotextile barrier for retaining soil carried by shallow runoff. The US EPA describes silt fencing as a sediment barrier that ponds water and allows settling; check the actual fabric specification rather than relying on the name.

Will a silt fence stop soil washing off a slope?

It catches some sediment after soil has moved. It does not stabilise the bare slope itself. Keep disturbance small and establish suitable surface protection as work progresses so the fence has less sediment to capture.

Is a silt fence required for a small residential project?

Check the approval conditions even for a small job. Blacktown's development controls, for example, require an erosion and sediment control plan for development involving disturbed soil or material storage. A small footprint is not enough to assume no controls are needed.

Can I wait until rain is forecast to install it?

Install the specified fence before disturbing the soil it protects. Waiting leaves the site exposed if weather changes or work creates an unexpected runoff path. Include installation in the site establishment sequence.

What can I use instead of a silt fence?

Alternatives depend on the site conditions and what the erosion and sediment control plan specifies. Coir logs, sediment basins, check dams and stabilised rock entrances each suit different flow types and disturbance areas. A silt fence handles shallow sheet flow; concentrated or high-volume runoff needs a control designed for that load. Ask the site designer before substituting, and check the full range of erosion control products to compare options.

Installation and removal

How deep does the silt fence need to be buried?

Follow the trench and embedment dimensions on your approved installation detail. Bury and compact the fabric base so runoff cannot pass underneath it; do not confuse fabric trench depth with the depth required for supporting posts.

Can a silt fence go across a drainage channel?

An ordinary silt fence should not be used to dam concentrated channel flow. The Kawartha Conservation factsheet identifies flowing ditches and streams as unsuitable high-flow locations. Ask the site designer to select a control appropriate to that flow.

When should a silt fence be removed?

Remove it after the contributing soil has been permanently stabilised and the site plan permits removal, not simply because building work has finished. Kawartha Conservation's removal guidance uses established vegetation as an example of stabilised ground.

Does orange fabric mean the fence is compliant?

No. Visibility is only one product characteristic. Compliance depends on the specified fabric and posts, correct placement, installation and maintenance under the requirements applying to the site.

Can I replace a specified fence with coir logs?

Only where that substitution is suitable for the flow and accepted under your site plan. Coir logs and silt fencing have different installation and performance characteristics, so ask the designer before swapping products. For Sydney projects where coir suits the design, see our guide to coir logs for Sydney erosion control projects.

Order silt fencing to your site specification

  • Measure each fence run and allow for the returns and joins shown on the plan.
  • Confirm roll width, fabric grade and required post strength.
  • Allow access for inspection and sediment removal when setting out the fence.