What Is Silt Fencing?

Silt fencing is a temporary sediment control barrier used around disturbed soil. Its permeable geotextile fabric slows muddy sheet flow, lets water pass through and holds back soil before it reaches stormwater drains, roads or waterways.

It is common on construction sites, civil works, subdivisions, landscaping projects and stockpile areas. A fence only works when it is placed in the right location, trenched into the ground and maintained after rain.

What is silt fencing?

A silt fence consists of woven geotextile fabric supported by hardwood stakes or steel posts. The lower edge is buried and backfilled so runoff cannot pass underneath it.

You may also hear it called a sediment fence, silt barrier fence, sediment barrier or silt netting. On Australian sites, these terms usually refer to the same temporary control: permeable fabric installed downslope of exposed soil to intercept sediment-laden runoff. For a closer look at where each type fits, the guide to silt barrier options and when to use each one covers the differences in more detail.

What is a silt barrier fence used for?

A silt barrier fence is used to contain sediment within a work area. It is suited to shallow sheet flow from exposed soil, earthworks and stockpiles, where water can spread along the fence and form a temporary pond.

Typical uses include:

  • the downslope boundary of a construction or landscaping site
  • below soil stockpiles and disturbed batters
  • around areas awaiting stabilisation or revegetation
  • before runoff reaches a road, stormwater inlet or neighbouring property

A silt fence is not designed for a flowing drain, creek or concentrated high-velocity runoff. Those conditions need controls selected for the flow rate and site design. Where concentrated flow is the problem, silt socks for erosion and sediment control or coir log berms are often a better fit because they can handle higher volumes without collapsing.

Whether a fence is needed on your site depends on consent conditions, local council requirements and the approved erosion and sediment control plan. The guide to when a silt fence is required walks through the regulatory triggers in more detail.

How does a sediment control silt fence work?

Runoff meets the fabric and slows, creating shallow ponding on the uphill side. Heavier soil particles settle out while water passes through the permeable fabric. Most standard silt fence fabric has a flow rate between 50 and 100 litres per minute per square metre, enough to let water through at a controlled pace while trapping the sediment it carries.

The fabric will not remove every fine particle. Its main job is to slow runoff and give sediment time to settle.

Fine clay can remain suspended, and water may go over or around the fence if the catchment is too large or the ends are not turned upslope.

The US EPA silt fence guidance also treats placement, ponding and maintenance as central to performance.

A silt fence works best as one part of a broader erosion and sediment control plan. It does the trapping, but other controls handle diversion, stabilisation and drainage. The page on comparing silt fencing with other erosion control methods explains how these controls complement each other on real sites.

Site note: Silt fencing is a sediment control measure. It should sit within the project's broader erosion and sediment control plan, which may also include clean-water diversion, stabilised access, sediment basins or surface stabilisation.

Key components of a silt fence

Each component has a simple job. Failure at one point can allow runoff to bypass the whole barrier.

  • Woven geotextile fabric: allows water through while slowing runoff and retaining sediment. The fabric is typically UV-stabilised, but prolonged sun exposure still weakens it over months.
  • Support stakes or posts: hold the fabric upright against the load from ponded water and collected soil. Hardwood stakes are standard on most Australian sites because they resist splitting when driven into firm ground.
  • Buried lower edge: stops water from undercutting the fence. The trench depth should match the project drawing, commonly 100 to 200 mm.
  • Fasteners: secure the fabric to each support without creating weak, sagging sections.
  • Upslope returns: turn the ends of the fence uphill so water does not escape around them.

For a standard perimeter run, the 0.77m x 100m standard green silt fence roll suits many routine jobs. The 0.77m x 100m orange high-visibility silt fence roll is easier to see around active work areas.

Support the fabric with 1500mm hardwood stakes suited to standard fence runs. If the plan specifies a longer stake, use the 1800mm hardwood stake option.

Choosing the right silt fence roll

Choose the roll around the run length, required exposed height, visibility and support method shown on the project's plan. Longer rolls reduce joins on large sites, while shorter rolls are easier to handle for small sections and repairs.

Site needPractical optionWhy it helps
Routine perimeter control0.77m green rollCompact format for standard runs
Active work areaOrange high-visibility rollEasier for plant operators and crews to see
Long run with fewer joins500m rollReduces joins across large sites
Specified tie reinforcementPremium roll with tieSupports secure attachment to posts

For longer perimeter runs, the 0.86m x 500m standard green silt fence roll reduces the number of roll changes. The 0.86m x 500m premium green silt fence roll with tie provides another option where the installation plan specifies a tied product.

Silt fence fabric is one type of geotextile. If the job also needs separation, filtration or drainage layers, the guide to matching a geotextile membrane to the job explains how those uses differ. For jobs that specifically require a woven product for load-bearing or separation, the guide to woven geotextile fabric for Australian projects covers what to look for.

When is construction silt fencing required?

Construction silt fencing may be required when disturbed soil can send sediment beyond the work area.

The trigger and required layout depend on the development consent, local council conditions, site risk and the approved erosion and sediment control plan.

Do not rely on a single distance or disturbed-area threshold for every Australian site. NSW guidance for small construction sites and the Managing Urban Stormwater guidelines show why controls must be selected for the work and drainage conditions. Check the applicable consent conditions and council requirements before soil disturbance starts.

A pre-start check should confirm:

  • where clean water enters and leaves the site
  • which areas will be disturbed and where soil will be stockpiled
  • the direction of sheet flow and any concentrated flow paths
  • the specified fence alignment, returns and tie-in points
  • who will inspect and repair the controls after rain

Installation considerations

Install the fence before earthworks begin, along the contour and downslope of the disturbed area. NSW guidance shows sediment fences following terrain contours, with the ends turned uphill and concentrated flows kept away from the fabric.

  1. Mark the approved alignment and identify underground services.
  2. Excavate the trench to the dimensions shown on the site plan.
  3. Place the fabric in the trench with the supports on the downslope side.
  4. Drive the stakes or posts to the specified depth and spacing.
  5. Pull the fabric firm, secure it to each support, then backfill and compact the trench.
  6. Turn each end upslope and close every join so runoff cannot slip through.

Exact trench dimensions, support spacing and exposed height should come from the applicable drawing or specification. Soil strength, slope, runoff load and fence product all affect the final detail. For a full step-by-step walkthrough with photos, the guide to installing silt fences on site covers each stage from trench preparation through to the final backfill.

Do not install a silt fence across a watercourse or concentrated flow path. Water pressure can flatten the fabric, scour beneath it or divert runoff around the ends.

Maintenance and inspection requirements

Inspect the full fence regularly, after significant rain and whenever earthworks change the drainage pattern. The inspection frequency and sediment removal trigger should follow the project's plan and consent conditions.

During each inspection:

  • look for tears, sagging fabric and loose fasteners
  • check for scour, undercutting and water bypassing the ends
  • remove accumulated sediment before it reduces the storage area or loads the fence
  • repair damaged sections before more rain is expected
  • check the fabric for UV degradation, especially on north-facing runs that cop direct sun all day
  • record the inspection and any corrective work

Leave the fence in place until the contributing area is stabilised and the site supervisor approves removal. Remove trapped sediment carefully so it cannot wash back into drainage lines.

Common installation mistakes to avoid

  • Leaving the lower edge exposed: runoff can pass beneath the fabric and carry sediment off site.
  • Running the fence straight up and down a slope: this channels water instead of spreading it along the barrier.
  • Using it in concentrated flow: silt fencing is made for sheet flow and shallow ponding. For drains and channels, a sediment control designed for higher flow rates will hold up where fabric cannot.
  • Leaving gaps at joins: water will find the weakest point, especially during heavy rain.
  • Setting supports too far apart: the fabric can sag or collapse under load. Most specifications call for stakes at 1.5 to 3 metre centres depending on the expected loading.
  • Skipping inspections: a small tear or blocked section can become a complete bypass after a single storm event.

Silt fencing questions

What is a silt fence used for?

A silt fence is used to stop sediment leaving disturbed ground in shallow runoff. It slows the water and creates a ponding area where soil can settle before the water moves through the fabric.

Does silt fence let water through?

Yes. Silt fence fabric is permeable, so water can pass through it. The barrier slows runoff and traps settled sediment, but fine particles may remain suspended and the fabric can clog if the fence is not maintained.

Where should a silt fence be installed?

Install it downslope of disturbed soil, along the contour and before runoff reaches a road, drain, property boundary or waterway. Follow the approved erosion and sediment control plan for the exact alignment.

Can silt fencing go across a drain or channel?

No. A standard silt fence should not cross a drain, creek or concentrated flow path. Use a control designed for that flow condition and shown on the project plan.

How long does a silt fence last?

It is a temporary control that remains only while the disturbed area presents a sediment risk. Service life depends on UV exposure, installation, site traffic, weather and maintenance, so inspect the fabric and supports rather than relying on a fixed number of months.

When should sediment be removed?

Remove sediment before it reduces the ponding area, loads the fabric or reaches the trigger in the site plan. After clearing it, repair any disturbed trench, fabric or supports.

How high should a silt fence be above ground?

Most Australian specifications call for 400 to 600 mm of exposed fabric above the finished ground level. The exact height depends on the expected sheet-flow depth and the product being used. Check the site plan or specification rather than guessing, because too much exposed fabric without enough stake depth will blow over in heavy rain.

How far apart should silt fence stakes be?

Typical spacing is 1.5 to 3 metres, depending on slope, expected water loading and the specification. Steeper slopes and higher runoff volumes usually call for closer centres. Always follow the project drawing rather than a general rule.

What is the difference between a silt fence and a silt sock?

A silt fence uses flat fabric stretched between stakes, while a silt sock is a mesh tube filled with compost or other filter media. Silt socks sit on the surface without trenching and handle slightly more concentrated flow, so they suit locations where digging a trench is impractical or the flow is too strong for flat fabric.

Can you reuse silt fence fabric after a project?

Generally not. UV exposure, sediment loading and physical wear from a single project usually leave the fabric too weak for a reliable second installation. Reused fabric may pass less water than new material and is more likely to tear under load. It is safer to start each project with a fresh roll.

Choose silt fencing for your site

Match the roll, stakes and installation detail to the approved plan and expected runoff. Browse the erosion control range for construction and landscaping work, including silt fence rolls and hardwood stakes.

For help selecting roll length, height or supports, contact the All Stake Supply team. Orders can be collected from the St Marys NSW warehouse or shipped Australia-wide.

Have a Question?

Contact Us

Our friendly and experienced staff are here to help with all of your supply needs. If you have an inquiry, please send us a message or call us.
Shopping Cart
Your cart is emptyReturn to Shop