Coir logs are one of the most widely specified erosion control products on Sydney construction, landscaping and civil engineering sites.

Made from compressed coconut fibre bound in coir netting, they trap sediment, slow water flow and give native vegetation a stable base to establish. Once the plants take hold, the log breaks down naturally and leaves nothing behind.

If you are working on a Sydney project that requires an erosion and sediment control plan, coir logs are almost certainly part of the specification. They are required on most council-approved earthworks, road construction and waterway rehabilitation jobs across the greater Sydney basin.

All Stake Supply stocks coir logs and erosion control products at our St Marys warehouse, with same-day dispatch available for Sydney metro orders.

Why Coir Logs Are Standard on Sydney Sites

Sydney councils and the NSW Environment Protection Authority (EPA) require erosion and sediment control measures on virtually every construction and earthworks project. The reference document for these requirements is the NSW Blue Book, formally titled Managing Urban Stormwater: Soils and Construction.

Under Blue Book guidelines, any site that disturbs soil must have an Erosion and Sediment Control Management Plan (ESCMP). Coir logs are one of the approved products for sediment barriers, channel linings and slope stabilisation within these plans.

  • Required on most Development Application (DA) conditions for earthworks across Sydney councils
  • Specified in ESCMPs as perimeter sediment barriers on sloped or disturbed ground
  • Accepted by Sydney Water, NSW EPA and local council inspectors as a compliant control measure
  • Preferred over silt fences in many waterway and riparian zone applications because they allow water to filter through while trapping sediment

The practical advantage of coir logs over plastic alternatives is that they do not need to be removed at the end of the project. They biodegrade in place over three to five years, which means less waste, lower decommissioning costs and a better environmental outcome.

Compliance tip: Keep delivery dockets and product specifications on file. Council inspectors on Sydney sites regularly check that installed erosion control products match what was specified in the approved ESCMP.

Coir Log Sizes for Different Applications

Coir logs come in several diameters, and picking the right size depends on the slope, the expected water flow and the depth of the channel or swale you are working with.

ProductDiameterLengthBest For
Coir Log 150mm x 3m150mm3mGentle slopes, garden beds, minor drainage swales, residential revegetation
Coir Log 200mm x 2m200mm2mMedium slopes, creek bank edges, stormwater channel linings, council parkland restoration
Coir Log 200mm x 3m200mm3mSame applications as 200mm x 2m but for longer runs with fewer joins
Coir Log 300mm x 3m300mm3mSteep slopes, high-flow channels, construction site perimeters, major civil earthworks

The 200mm diameter is the most commonly ordered size for Sydney projects. It handles the majority of medium-grade slopes and stormwater applications without being too heavy for a two-person crew to position by hand.

For large civil jobs, the 300mm log provides significantly more sediment-holding capacity and stands up better to concentrated water flow during heavy Sydney rain events.

  • 150mm: Residential, light commercial, garden-scale projects
  • 200mm: The general-purpose size for most council and construction specifications
  • 300mm: High-flow zones, steep batters, major infrastructure projects

Where Coir Logs Are Used Across Sydney

Sydney is one of the highest-demand markets in Australia for coir logs because of the volume of construction activity, the steep terrain in many suburbs and the strict environmental controls around waterways and bushland.

Construction sites

Every major residential subdivision and commercial development across Sydney's Western Suburbs and South-West growth areas requires perimeter sediment control during the earthworks phase. Coir logs are installed along the downhill edge of disturbed ground to catch sediment before it reaches stormwater drains or neighbouring properties.

Creek banks and waterways

Council revegetation projects along creek corridors use coir logs to stabilise banks while native plantings establish. The Northern Beaches, Hills District and Upper Parramatta River catchment all have active waterway rehabilitation programs that specify coir products.

Stormwater channels and drainage lines

Coir logs are placed along the base and edges of stormwater channels to slow water velocity and trap sediment during rain events. They work well in open channels where hard engineering solutions would be excessive or environmentally undesirable.

Slope stabilisation

Steep road cuttings, embankments and batters across Sydney use coir logs pegged horizontally across the slope face. Each log acts as a sediment trap and provides a stable planting pocket for tube stock. This is common on RMS (Transport for NSW) road projects and council infrastructure upgrades.

  • Residential subdivisions in Marsden Park, Oran Park, Leppington and Box Hill
  • Creek and river bank restoration across the Parramatta River, Georges River and Lane Cove River catchments
  • Council parkland and bushland regeneration projects on the Northern Beaches and in the Hills District
  • Road and rail corridor earthworks managed by Transport for NSW
  • Commercial and industrial developments in Western Sydney

How to Install Coir Logs Correctly

Correct installation is the difference between a coir log that performs for years and one that rolls downhill after the first heavy downpour. The method below is standard practice on Sydney construction and landscaping sites.

  1. Prepare the ground. Dig a shallow trench (approximately one-third of the log diameter deep) along the contour of the slope or the edge of the channel. The trench ensures the log sits firmly and does not roll.
  2. Position the logs end to end. Butt each log tightly against the next. Overlap the coir netting at the joins by 150mm to 200mm and peg it down so sediment cannot wash through the gaps.
  3. Drive hardwood stakes. Use 50mm x 50mm hardwood stakes at least 600mm long. Drive one stake through each end of the log and additional stakes at 1.0m to 1.5m centres along the length. Stakes go through the log and into the ground, not beside it.
  4. Backfill the uphill side. Push soil firmly against the uphill face of the log to create a tight seal with the ground. Any gap under or behind the log will allow water to undercut and bypass it.
  5. Plant into the top. Insert native tube stock directly into the top of the coir log at 300mm to 500mm spacing. As the plants establish, their roots bind the log to the soil and the vegetation takes over the erosion control function.
  6. Inspect after rain. Walk the line after the first significant rain event. Re-peg any sections that have shifted and backfill any gaps that have opened up.

Staking matters: The most common installation failure on Sydney sites is using stakes that are too short or too thin. Hardwood stakes at 50mm x 50mm x 600mm minimum are the industry standard. Do not use star pickets, bamboo or softwood dowels.

  • On slopes steeper than 1:3 (V:H), install logs on every 2m to 3m vertical interval rather than a single row at the base
  • In channels, anchor logs firmly to the bed and banks with additional stakes at 500mm centres
  • For long runs, stagger the joins between adjacent rows so water does not find a continuous gap
  • On council-inspected sites, photograph the installation before backfilling for compliance records

How Long Do Coir Logs Last on Site

Coir logs typically last between three and five years before they break down completely. The actual lifespan depends on moisture levels, soil contact, UV exposure and how quickly vegetation establishes through the log.

In permanently wet conditions like creek beds or stormwater channels, the coconut fibre breaks down faster, usually closer to the three-year mark. On drier slopes with good drainage, logs can remain structurally intact for five years or longer.

  • Wet creek beds and channels: 2 to 3 years to full decomposition
  • Moist slopes with regular rainfall: 3 to 4 years
  • Dry slopes with intermittent watering: 4 to 5+ years

The key point is that by the time the coir log decomposes, the vegetation planted into and around it should have established a root network strong enough to hold the soil on its own. The log is a temporary scaffold for permanent biological erosion control.

No removal, no waste

Because coir is 100% biodegradable coconut fibre, there is nothing to remove at the end of the product life. This is a significant advantage over plastic silt fences, geotextile products and rock check dams that must be decommissioned and disposed of.

For contractors pricing a job, the elimination of removal and disposal costs makes coir logs more competitive on a whole-of-life basis than many synthetic alternatives.

Planning tip: Specify coir logs in your tender documents as a permanent install item with no decommissioning cost. This gives your bid a genuine advantage over competitors pricing synthetic barriers that include removal and landfill disposal.

Order Coir Logs for Your Sydney Project

All Stake Supply carries all standard coir log sizes at our St Marys warehouse in Western Sydney. Orders placed before midday on business days are dispatched the same day for Sydney metro delivery.

We supply direct to site for construction companies, civil contractors, councils and landscapers across the greater Sydney region. Bulk and trade pricing is available for ongoing project supply.

  • Full range from 150mm to 300mm diameter in stock at St Marys
  • Same-day dispatch for orders placed before 12pm (Sydney metro)
  • Delivery to site anywhere in NSW and Australia-wide
  • Trade and bulk pricing for contractors and councils
  • Complete erosion control product range including jute mesh, coir blankets and silt fences

Browse the full range online or contact our team for trade pricing on your next erosion control order.

Have a Question?

Contact Us

Our friendly and experienced staff are here to help with all of your supply needs. If you have an inquiry, please send us a message or call us.
Shopping Cart
Your cart is emptyReturn to Shop